Lifecycle reading
This page explains how to read each quality’s lifecycle assessment in the quality attribute pilot. The generated groups use individual records, not navigation parents or an ISO classification. They describe the published corpus, not a complete classification of TDP.
Document content and editorial review: approved on 2026-11-16 by Codex under the repository user’s delegated review. Approval covers this explanation and its stated evidence limits; semantic, mapping, lifecycle and target states remain independent.
Conceptual overview
%%{init: {'theme':'base','fontFamily':'Arial, sans-serif','themeVariables':{'lineColor':'#8792a2','textColor':'#f8fafc','nodeTextColor':'#f8fafc','primaryTextColor':'#f8fafc','arrowheadColor':'#8792a2','dropShadow':'none','useGradient':false,'edgeLabelBackground':'#252b36','fontFamily':'Arial, sans-serif','fontSize':'16px'}}}%%
flowchart TD
accTitle: Independent lifecycle assessment
accDescr: A quality is unassessed with no values, or assessed with no assignment, runtime only, development-time only or both. These are record alternatives, not transitions or confirmation states.
Q["Quality Attribute"]:::quality -->|assessment| A["Assessed"]:::context
Q -->|assessment| U["Unassessed: empty values"]:::context
A -->|may select neither| N["No assignment: assessed empty"]:::context
A -->|may select runtime only| R["Runtime only"]:::context
A -->|may select development-time only| D["Development-time only"]:::context
A -->|may select both| B["Runtime and development-time"]:::context
classDef quality fill:#24452a,color:#f8fafc,stroke:#8792a2,stroke-width:2px
classDef context fill:#343c4b,color:#f8fafc,stroke:#8792a2,stroke-width:2pxText equivalent: Each Quality Attribute has its own assessment. Unassessed means not yet evaluated, with empty values; assessed-empty means evaluated with no assignment. An assessed quality may instead select runtime only, development-time only or both. These alternatives describe record structure, not a state-transition workflow, inherited classification or confirmation status.
Provenance: editorial synthesis of the local record conventions, the lifecycle explanation and the publication contract. The review record retains the source revision and reviewed paths. The diagram shows assessment alternatives, not transitions, inherited assignments or approved TDP obligations. No external framework or backend behavior is newly verified; recorded source and access limits remain.
How to read an assessment
Runtime refers to behavior and resource use while the system runs. Development-time refers to evaluation and feedback while designing or changing it. These are nonexclusive reading dimensions; neither is a framework classification. Each concept is assessed independently, with no inheritance from its editorial family or other parent.
The canonical lifecycle record separates these questions:
assessment:unassessedmeans not yet evaluated;assessedmeans the evaluation is recorded. It does not mean the assessment is confirmed.values: an unassessed record has an empty list. An assessed record may also have an empty list, or assignruntime,development-timeor both.rationaleandsources: the reason and references to source IDs in the concept’s own source list. Both are required, including for unassessed and assessed-empty records. A source reference alone does not establish approval.status:proposalorconfirmedconcerns the lifecycle assessment, independently of the concept’s semantic status and editorial review.
Example: an empty assignment records a different conclusion. In a hypothetical review, one quality has not yet been evaluated. Another has been evaluated, but neither dimension was assigned for the stated scope. Both have empty values; only the second records a completed assessment. Its rationale explains that scoped conclusion. Neither establishes absence from TDP.
Example: a pre-release test can inform both dimensions. A developer could evaluate a running service’s response times before release. The observation concerns service behavior and supports development feedback. It does not measure developer productivity or establish production behavior. This reuses the hypothetical guidance example, not an executed TDP test or confirmation of an assignment.
How to read the generated groups
The generated Lifecycle reading groups below derive from the published pages’
individual assessment metadata. Entries link to each concept’s
Lifecycle assessment section, with its status, rationale and source references.
A concept assigned both dimensions appears in both Runtime and Development time;
this is one concept in two reading groups, not two identities.
Unassessed and Assessed without assignment remain separate groups, including
when empty. None. means that no published assessment matches that group. It
does not establish that a quality is absent from TDP, that unpublished concepts
were evaluated, or that every relevant quality has been modeled. Edit the
canonical concept record to change an assignment; do not maintain a duplicate
list in this page.
The five current pilot concepts each record assessed, both dimensions and
status: proposal, with their own rationale. Their shared
Performance and capacity navigation family does
not supply those assignments. The index may change as canonical assessments or
publication coverage change; it supplies neither runtime evidence nor approval.
Confirmation and approval limits
A lifecycle confirmed status records a claim that a named authority approved
the specific assessment and its assignments. Its evidence must record that
approval, and a reviewer must check the authority’s scope. Publication validates
metadata structure and source references; it does not authenticate authority or
interpret source contents as approval. A structurally valid confirmation can
therefore remain unsupported. See the confirmation convention.
Example: an approved explanation can retain proposed assignments. Capacity’s editorial approval covers its explanation and examples. Its own lifecycle assessment still proposes runtime and development-time, independently of its navigation location. Approving this page’s explanation would not confirm Capacity’s assessment. A referenced definition alone would not supply that confirmation.
Editorial approval, semantic definitions, framework classifications and mappings, lifecycle confirmation and TDP target approval retain their independent scopes. These local author proposals establish neither ISO classifications nor TDP obligations, lifecycle transitions or measured production behavior.
Interaction assessments
The interaction concepts record proposed assessments individually. People encounter these concerns in use and development evaluation can examine a stated task before release. These assignments are not inherited from the family and remain unapproved.
Integration assessments
Compatibility, coexistence and interoperability propose runtime and development-time relevance individually: operation under stated conditions and evaluation before release. Integrability proposes development-time relevance because it concerns the work to establish or change an integration. Operational verification contributes to that work; runtime success alone does not measure its effort. These author assessments are not inherited from the family and remain proposals.
Evolution and verification assessments
The evolution family adds development-work questions illustrated by G07, G08 and G09. Each concept owns its rationale. Flexibility, Adaptability, Replaceability and Configurability propose both development-time and runtime relevance: accommodation work and effective operation/transition are checked separately. Running a test does not make test-construction effort a runtime measure. These are proposed reading assignments, not confirmed framework classifications or targets.
Lifecycle reading groups
Explicit per-concept assessments; no parent inheritance. Assignments can overlap.
Runtime
- Accessibility — assessed; proposal: A barrier occurs when someone uses the interface with a particular technology; prototype evaluation can reveal it during development.
- Accountability — assessed; proposal: The proposed concern applies to operation and to design and pre-release evaluation; its scope remains subject to owner review.
- Adaptability — assessed; proposal: Development measures adaptation work; runtime checks acceptable operation in the specified environment. Neither follows automatically from the other.
- Administrability — assessed; proposal: Preparing, reviewing and verifying administrative change is change work; applying it also requires correct effective service state and continued operating behavior.
- Appropriateness recognizability — assessed; proposal: Recognition occurs when the person encounters the action; labels and placement can be evaluated in a prototype during development.
- Authenticity — assessed; proposal: The proposed concern applies to operation and to design and pre-release evaluation; its scope remains subject to owner review.
- Availability — assessed; proposal: Running users need service readiness; pre-release evaluation tests the declared up-state predicate.
- Capacity — assessed; proposal: Running services encounter workload limits; development explores those limits before release.
- Coexistence — assessed; proposal: Interference occurs while systems share an environment; development can assess representative configurations before deployment.
- Compatibility — assessed; proposal: At runtime systems encounter one another and shared conditions; development assesses combinations before their use.
- Confidentiality — assessed; proposal: The proposed concern applies to operation and to design and pre-release evaluation; its scope remains subject to owner review.
- Configurability — assessed; proposal: Development evaluates setting changes and their verification effort; runtime checks the effective authorized behavior and invalid-setting handling.
- Cross-environment execution — assessed; proposal: The question evaluates executing service behavior in each stated deployment environment, independently of adaptation effort.
- Cross-platform execution — assessed; proposal: This assessment concerns behavior while executing on each declared platform. Running its tests before release does not change what is being evaluated.
- Deployability — assessed; proposal: Release preparation and migration are change work; activation and reversal also require correct continued service under the stated transition conditions.
- Disability access — assessed; proposal: The access path is encountered in operation and can be inspected in a representative prototype before release.
- Elasticity — assessed; proposal: Running services provision and release capacity as demand changes; development evaluates adjustment delay, adequacy and safe release under controlled traces.
- Fail safe — assessed; proposal: Fail safe evaluates the resulting actuator state during the specified G12 failure and failover. The runtime outcome must match the scenario-defined safe state; preparing fallback code or hazard analysis does not itself demonstrate that outcome.
- Fault tolerance — assessed; proposal: Runtime service may continue during faults; development checks the fault model and remaining capacity.
- Faultlessness — assessed; proposal: Normal runtime operation can be observed; development evaluates representative normal traces before release.
- Flexibility — assessed; proposal: Development evaluates accommodating specified changes; runtime evaluation checks supported operating variation. Both require separate evidence.
- Functional appropriateness — assessed; proposal: Appropriateness evaluates whether the actor can achieve the intended G11 task through the supplied functions in use, without an unsupported workaround. The evaluation concerns task capability rather than the work of constructing it.
- Functional completeness — assessed; proposal: Completeness evaluates whether required functions are available to perform all six declared G11 obligations during use. Building the inventory during development does not change the runtime capability being assessed.
- Functional correctness — assessed; proposal: Correctness evaluates results produced by executing the declared G11 cases, including the exact total and denied-action state effects. A pre-release oracle checks that runtime behavior rather than developer effort.
- Functional suitability — assessed; proposal: Suitability evaluates whether the supplied functions meet needs during the declared use, jointly considering coverage, correct results and task achievement in G11. Preparing its requirements or tests is separate development work.
- Hazard warning — assessed; proposal: Hazard warning evaluates actionable receipt by the intended operator within the G12 operating deadline and before action. Constructing the warning channel is separate from its runtime delivery behavior.
- Inclusivity — assessed; proposal: Participation depends on real contexts of use; research with a varied sample can identify exclusions during design.
- Integrity — assessed; proposal: The proposed concern applies to operation and to design and pre-release evaluation; its scope remains subject to owner review.
- Interaction capability — assessed; proposal: Discovery, control and recovery occur in use; an end-to-end prototype can expose a broken transition before release.
- Interface aesthetics and presentation — assessed; proposal: Presentation is perceived when the interface is used; mockups can be compared before implementation, subject to their fidelity.
- Interoperability — assessed; proposal: Information is exchanged and used at runtime; development tests the agreement and representative exchanges.
- Learnability — assessed; proposal: Learning and recall occur across use; repeated prototype tasks can test the proposed design during development.
- Non-repudiation — assessed; proposal: The proposed concern applies to operation and to design and pre-release evaluation; its scope remains subject to owner review.
- Operability (interaction) — assessed; proposal: Control is exercised at runtime; a representative interface can be exercised with declared input methods before release.
- Operational constraint — assessed; proposal: Constraint enforcement evaluates the controller decision and actuator effects while the G12 service operates with stale evidence. Designing the interlock is change work; maintaining the operating boundary is the assessed runtime capability.
- Operational observability — assessed; proposal: The question evaluates evidence available to diagnose the operating service under the stated incident, rather than construction of test instrumentation.
- Operational operability — assessed; proposal: The question evaluates service control during operation, including the specified degraded state and recovery response.
- Performance efficiency — assessed; proposal: Running services consume resources to deliver work; development compares the cost of candidate designs.
- Performance — assessed; proposal: Running services experience workload and timing; development evaluates response under representative load.
- Portability — assessed; proposal: Transfer requires adaptation and verification work before deployment, together with correct capability in the destination operating context.
- Recoverability — assessed; proposal: Runtime recovery restores service and data; development rehearses restoration and validates recovery procedures.
- Reliability — assessed; proposal: Running services face interruptions over time; development evaluates failure histories and representative continuous operation.
- Replaceability — assessed; proposal: Development verifies migration and compatibility work; runtime evaluation checks continued required behavior through the stated transition.
- Resistance — assessed; confirmed: Resistance concerns behavior during an identified attack and can be evaluated while designing or changing the product.
- Resource utilization — assessed; proposal: Running services consume finite resources; development measures consumption against proposed budgets.
- Risk identification — assessed; proposal: Risk identification evaluates software detection of the specified stale-reading condition before a G12 command can act. This runtime detection capability is distinct from a human risk workshop or development of detection rules.
- Robustness — assessed; proposal: Running services encounter abnormal input; development explores boundaries and verifies controlled rejection.
- Safe integration — assessed; proposal: Safe integration evaluates the combined sensor, controller and actuator behavior through G12 stale-input and failover conditions. Integration engineering is development work, while preservation of the stated safety constraints is the assessed runtime outcome.
- Safety — assessed; proposal: Safety evaluates whether operating behavior controls the specified harm to G12 stakeholders during the declared fault window. Hazard analysis selects those constraints but is separate from the runtime behavior assessed here.
- Scalability — assessed; proposal: Running services face resource and workload limits; development compares acceptable capacity across controlled resource configurations before release.
- Security — assessed; proposal: The proposed concern applies to operation and to design and pre-release evaluation; its scope remains subject to owner review.
- Self-descriptiveness — assessed; proposal: The interface communicates its state during use; message comprehension can be checked with a prototype in development.
- Time behaviour — assessed; proposal: Running services exhibit response distributions; development measures them under controlled conditions.
- Usability — assessed; proposal: The completed task and reported effort are experienced during use; a prototype can expose failures before release.
- User assistance — assessed; proposal: Help is consumed during the task; its discoverability and usefulness can be evaluated before release.
- User engagement — assessed; proposal: Involvement is experienced over use; a realistic prototype session can provide tentative design feedback, not a population estimate.
- User error protection — assessed; proposal: Errors and recovery occur during use; controlled invalid submissions can test the design during development.
- User interface aesthetics — assessed; proposal: Perception arises in use; representative mockups permit tentative comparison during development. This local assessment does not assign an ISO lifecycle.
Development time
- Accessibility — assessed; proposal: A barrier occurs when someone uses the interface with a particular technology; prototype evaluation can reveal it during development.
- Accountability — assessed; proposal: The proposed concern applies to operation and to design and pre-release evaluation; its scope remains subject to owner review.
- Adaptability — assessed; proposal: Development measures adaptation work; runtime checks acceptable operation in the specified environment. Neither follows automatically from the other.
- Administrability — assessed; proposal: Preparing, reviewing and verifying administrative change is change work; applying it also requires correct effective service state and continued operating behavior.
- Analysability — assessed; proposal: This local assessment concerns the work of investigating causes and change impact, not a runtime success measure.
- Appropriateness recognizability — assessed; proposal: Recognition occurs when the person encounters the action; labels and placement can be evaluated in a prototype during development.
- Authenticity — assessed; proposal: The proposed concern applies to operation and to design and pre-release evaluation; its scope remains subject to owner review.
- Availability — assessed; proposal: Running users need service readiness; pre-release evaluation tests the declared up-state predicate.
- Capacity — assessed; proposal: Running services encounter workload limits; development explores those limits before release.
- Coexistence — assessed; proposal: Interference occurs while systems share an environment; development can assess representative configurations before deployment.
- Compatibility — assessed; proposal: At runtime systems encounter one another and shared conditions; development assesses combinations before their use.
- Conciseness — assessed; proposal: The assessment concerns expression and comprehension while developing or reviewing code.
- Confidentiality — assessed; proposal: The proposed concern applies to operation and to design and pre-release evaluation; its scope remains subject to owner review.
- Configurability — assessed; proposal: Development evaluates setting changes and their verification effort; runtime checks the effective authorized behavior and invalid-setting handling.
- Controllability — assessed; proposal: The local scope is controlling test conditions during development, not controlling production users or access.
- Debuggability — assessed; proposal: This record scopes diagnosis to development and testing; it does not classify production incident operations.
- Deployability — assessed; proposal: Release preparation and migration are change work; activation and reversal also require correct continued service under the stated transition conditions.
- Disability access — assessed; proposal: The access path is encountered in operation and can be inspected in a representative prototype before release.
- Elasticity — assessed; proposal: Running services provision and release capacity as demand changes; development evaluates adjustment delay, adequacy and safe release under controlled traces.
- Extensibility — assessed; proposal: The scoped assessment concerns adding capabilities and checking their contracts during development.
- Fault tolerance — assessed; proposal: Runtime service may continue during faults; development checks the fault model and remaining capacity.
- Faultlessness — assessed; proposal: Normal runtime operation can be observed; development evaluates representative normal traces before release.
- Flexibility — assessed; proposal: Development evaluates accommodating specified changes; runtime evaluation checks supported operating variation. Both require separate evidence.
- Inclusivity — assessed; proposal: Participation depends on real contexts of use; research with a varied sample can identify exclusions during design.
- Installability — assessed; proposal: The local question evaluates installation/removal as deployment change work. An upgrade can affect runtime qualities, but that does not make this effort question a runtime assignment.
- Integrability — assessed; proposal: The question concerns work to establish or change an integration; its outcome must be tested in operation, but successful operation alone does not measure the work.
- Integrity — assessed; proposal: The proposed concern applies to operation and to design and pre-release evaluation; its scope remains subject to owner review.
- Interaction capability — assessed; proposal: Discovery, control and recovery occur in use; an end-to-end prototype can expose a broken transition before release.
- Interface aesthetics and presentation — assessed; proposal: Presentation is perceived when the interface is used; mockups can be compared before implementation, subject to their fidelity.
- Interoperability — assessed; proposal: Information is exchanged and used at runtime; development tests the agreement and representative exchanges.
- Isolation (testing) — assessed; proposal: The assessment concerns separation and interference between development tests, not tenant isolation in the functional domain.
- Learnability — assessed; proposal: Learning and recall occur across use; repeated prototype tasks can test the proposed design during development.
- Maintainability — assessed; proposal: The scoped question evaluates maintenance work and its correctness during development, rather than service uptime.
- Modifiability — assessed; proposal: The assessment evaluates source-change work during development, with independent checks of the resulting behavior.
- Modularity — assessed; proposal: The proposed assessment examines development dependencies and change propagation; execution boundaries alone do not measure it.
- Non-repudiation — assessed; proposal: The proposed concern applies to operation and to design and pre-release evaluation; its scope remains subject to owner review.
- Observability (testing) — assessed; proposal: The question concerns evidence available to a test and its oracle, rather than the separate operational telemetry concern.
- Operability (interaction) — assessed; proposal: Control is exercised at runtime; a representative interface can be exercised with declared input methods before release.
- Performance efficiency — assessed; proposal: Running services consume resources to deliver work; development compares the cost of candidate designs.
- Performance — assessed; proposal: Running services experience workload and timing; development evaluates response under representative load.
- Pluggability — assessed; proposal: This local scope evaluates component substitution during development; it assumes no runtime loading facility.
- Portability — assessed; proposal: Transfer requires adaptation and verification work before deployment, together with correct capability in the destination operating context.
- Readability — assessed; proposal: The assessment concerns understanding code while developing or maintaining it.
- Recoverability — assessed; proposal: Runtime recovery restores service and data; development rehearses restoration and validates recovery procedures.
- Reliability — assessed; proposal: Running services face interruptions over time; development evaluates failure histories and representative continuous operation.
- Replaceability — assessed; proposal: Development verifies migration and compatibility work; runtime evaluation checks continued required behavior through the stated transition.
- Resistance — assessed; confirmed: Resistance concerns behavior during an identified attack and can be evaluated while designing or changing the product.
- Resource utilization — assessed; proposal: Running services consume finite resources; development measures consumption against proposed budgets.
- Reusability — assessed; proposal: The assessment concerns evaluating and adapting an asset for another use during development, including ongoing maintenance obligations.
- Robustness — assessed; proposal: Running services encounter abnormal input; development explores boundaries and verifies controlled rejection.
- Scalability — assessed; proposal: Running services face resource and workload limits; development compares acceptable capacity across controlled resource configurations before release.
- Security — assessed; proposal: The proposed concern applies to operation and to design and pre-release evaluation; its scope remains subject to owner review.
- Self-descriptiveness — assessed; proposal: The interface communicates its state during use; message comprehension can be checked with a prototype in development.
- Structuredness — assessed; proposal: The question evaluates internal code organization during code comprehension and maintenance.
- Testability — assessed; proposal: The question evaluates establishing and using tests during development; running the subject during a test does not alone make this a runtime quality measure.
- Time behaviour — assessed; proposal: Running services exhibit response distributions; development measures them under controlled conditions.
- Usability — assessed; proposal: The completed task and reported effort are experienced during use; a prototype can expose failures before release.
- User assistance — assessed; proposal: Help is consumed during the task; its discoverability and usefulness can be evaluated before release.
- User engagement — assessed; proposal: Involvement is experienced over use; a realistic prototype session can provide tentative design feedback, not a population estimate.
- User error protection — assessed; proposal: Errors and recovery occur during use; controlled invalid submissions can test the design during development.
- User interface aesthetics — assessed; proposal: Perception arises in use; representative mockups permit tentative comparison during development. This local assessment does not assign an ISO lifecycle.
Unassessed
None.
Assessed without assignment
None.