Availability
Concept status: approved by the repository user on 2026-11-11. Approval covers this local meaning and its stated limits. Mappings, lifecycle assessments, TDP applicability and targets retain their separate states.
Document content and editorial review: approved on 2026-11-16 by Codex under the repository user’s delegated review. Approval covers this explanation and its stated evidence limits; semantic, mapping, lifecycle and target states remain independent.
Whether the declared service is usable when required within a stated service window. The repository user approved this local reading on 2026-11-11. TDP applicability, numerical targets and lifecycle confirmation remain unapproved.
Conceptual overview
%%{init: {'theme':'base','fontFamily':'Arial, sans-serif','themeVariables':{'lineColor':'#8792a2','textColor':'#f8fafc','nodeTextColor':'#f8fafc','primaryTextColor':'#f8fafc','arrowheadColor':'#8792a2','dropShadow':'none','useGradient':false,'edgeLabelBackground':'#252b36','fontFamily':'Arial, sans-serif','fontSize':'16px'}}}%%
flowchart TD
accTitle: Availability accounts for the entire required-use window
accDescr: Up and down seconds partition the required-use window. Their ratio supports a scoped readiness conclusion, not an uninterrupted-service claim.
U["3,580 up seconds"]:::measure -->|divide by required-use time| A["99.444 percent time availability"]:::quality
D["20 down seconds"]:::measure -->|included in 3,600 s denominator| A
A -->|still includes interruption| L["No failure-free-hour claim"]:::context
classDef context fill:#343c4b,color:#f8fafc,stroke:#8792a2,stroke-width:2px
classDef quality fill:#24452a,color:#f8fafc,stroke:#8792a2,stroke-width:2px
classDef measure fill:#503824,color:#f8fafc,stroke:#8792a2,stroke-width:2pxText equivalent: G02 A partitions 3,600 required seconds into 3,580 up and 20 down. Their ratio measures time availability; the 20 s interruption still occurred. Arrows describe accounting, not a framework hierarchy.
Provenance: local synthesis using the source records above and synthetic G02 guidance. It establishes neither observed architecture nor a verified framework hierarchy.
Definition and status
Whether the declared service is usable when required within a stated service window. The repository user approved this local wording on 2026-11-11; it is not an ISO quotation or a TDP commitment.
Reliability concerns correct service over an interval; availability measures readiness when required. A short recovery can limit downtime without preventing failure. See the family comparison for the linked nearby concepts.
Applicability and source limits
Which users need which functions, on what required-use schedule? Resolve applicability and acceptance criteria with the owner. The source and edition record distinguishes catalogue facts, Q42’s own labels and secondary ISO attributions. Full ISO definitions were not consulted; no ISO hierarchy, exact equivalence or complete taxonomy is asserted.
Worked use and verification
Example: scope limits the result. G02 A is up for 3,580 of 3,600 required seconds (99.444…%); its process state alone would not establish usable service. These are synthetic observations, not measured TDP results. See the canonical reasoning.
Use the technique evaluation for prerequisites, costs, interactions and rejection criteria, and the executive and technical discussions for audience-specific decisions. The independent lifecycle proposal is derived from this concept’s metadata, never from its navigation family.
Lifecycle assessment
assessed; proposal. Assignment: runtime, development-time.
Running users need service readiness; pre-release evaluation tests the declared up-state predicate. Sources: q42.