Performance and capacity
Performance and capacity is an editorial family for five approved local quality concepts and two proposed scaling qualities. Performance asks whether a stated workload meets the scenario’s criteria; Time behaviour describes timing; Capacity varies demand while retaining constraints; Resource utilization describes consumption; Performance efficiency relates consumption to correct useful work. The comparison links to synthetic G01 examples and their worked reasoning. Scalability and elasticity extend the comparison to resource changes and demand transitions.
Document content and editorial review: approved on 2026-11-16 by Codex under the repository user’s delegated review. Approval covers this explanation and its stated evidence limits; semantic, mapping, lifecycle and target states remain independent.
Conceptual overview
%%{init: {'theme':'base','fontFamily':'Arial, sans-serif','themeVariables':{'lineColor':'#8792a2','textColor':'#f8fafc','nodeTextColor':'#f8fafc','primaryTextColor':'#f8fafc','arrowheadColor':'#8792a2','dropShadow':'none','useGradient':false,'edgeLabelBackground':'#252b36','fontFamily':'Arial, sans-serif','fontSize':'16px'}}}%%
flowchart TD
accTitle: Five quality questions in a scoped evaluation
accDescr: Scoped workload and configuration support joint performance criteria, timing, demand variation, resource accounting and useful-work counts. Efficiency relates consumption to correct useful work. Arrows describe evaluation relationships, not semantic parenthood or observed TDP behavior.
W["Scoped workload and configuration"]:::context -->|evaluate joint scenario criteria| P["Performance"]:::quality
W -->|measure response and completion timing| T["Time behaviour"]:::quality
W -->|vary demand and retain constraints| C["Capacity"]:::quality
W -->|account for consumption| R["Resource utilization"]:::quality
W -->|count correct useful work| E["Performance efficiency"]:::quality
R -->|relate consumption to useful work| E
classDef context fill:#343c4b,color:#f8fafc,stroke:#8792a2,stroke-width:2px
classDef quality fill:#24452a,color:#f8fafc,stroke:#8792a2,stroke-width:2pxText equivalent: A scoped workload and configuration frame the evaluation. Performance evaluates the scenario’s criteria together; Time behaviour measures response and completion timing. Capacity varies demand while retaining constraints. Resource utilization accounts for consumption. Correct useful-work counts and that consumption support Performance efficiency comparisons. These are reading and evaluation relationships, not membership, semantic equivalence or framework parentage.
The context node does not represent one execution. G01-C varies demand across separate runs; G01-E compares alternatives under equivalent workload and accounting conditions.
Provenance: editorial synthesis of the five approved local definitions and G01 and its variants. The source revision and reviewed paths are retained in the repository’s review record. No backend or external framework source is newly verified; the recorded editions and access limits retain their scope. The diagram establishes no framework hierarchy, approved target or measured TDP result.
Compare the questions
Definitions belong to the linked concept pages. All observations below are synthetic; their criteria are illustrative and unapproved. G01 describes a hypothetical project-information read service, not this portal or an observed TDP endpoint. Follow each example’s linked conditions, method and interpretation.
| Concept | Question and concrete example | Canonical example and method | Distinction |
|---|---|---|---|
| Performance | Does the read service meet the scenario’s criteria at the stated workload? Run A satisfies timing, correct work, errors and stated resource limits together; Run B meets throughput but fails the joint result. | Client timings, correct completions, errors and resource conditions in G01 results. | Joint acceptance does not require a work-to-resource ratio. Resource limits apply when stated by the scenario. |
| Time behaviour | How long does the response take, between which events and for which population? Run A’s p95 is 420 ms among correct, authorized successes during the 600 s hold. | Client dispatch to complete receipt in the measurement boundaries, with the percentile population. | A dependency interval cannot replace the full response time. The success-only p95 excludes errors and is not every user’s complete wait. |
| Capacity | How much demand meets the constraints? 50 requests/s is the highest tested passing rate; 60 fails in G01-C. | Load steps and interpretation, including timing, errors, relative throughput and resource checks. | Intermediate rates remain untested. The highest tested pass establishes neither an exact maximum nor a safe operating limit. |
| Resource utilization | Which resources are consumed, within which boundary and window? Run A’s peak service memory is 1.2 GiB, including its cache. | Service accounting, separate dependency resources and observation windows in the G01 method. | A peak is not average or accumulated memory use. Consumption alone supplies no useful-work ratio or budget verdict without a stated criterion. |
| Performance efficiency | What correct useful work does resource use deliver? G01-E’s cache treatment completes 46.1 correct reads per CPU-second versus 27.6 without caching, under equivalent conditions. | Equivalent workloads, service CPU time, peak memory and the correctness comparison. | Lower service CPU cost does not establish lower total cost. Memory rises, and the apparently favorable TTL-only alternative fails correctness. |
Example: a passing counter can accompany a failed scenario. In synthetic G01 Run B, 29,400 correct authorized completions over 600 s yield 49 requests/s, meeting the illustrative throughput criterion. Timing, errors and CPU still fail. The joint result requires all stated criteria together; none is an approved TDP target.
Example: lower service CPU has a memory trade-off. In synthetic G01-E, correct reads per CPU-second rise from 27.6 to 46.1 while peak service memory rises from 0.8 to 1.2 GiB. Dependency resources require separate accounting; the comparison establishes no total-cost saving. Follow the controlled comparison for the calculations, correctness checks and illustrative, unapproved criteria.
Performance and Performance efficiency remain distinct approved local meanings. The comparison explains their current usage; it approves neither synonymy nor a parent/child relationship. ISO full-text and mapping limits remain in the reference. Lifecycle assessments remain independent, even when concepts share this navigation family. Each quality’s own assessment records its rationale and proposal status; the lifecycle explanation distinguishes evaluating a running service during development from measuring developer productivity. The historical editorial approval covers the earlier explanation, examples and diagram. It does not confirm semantic definitions, classifications, mappings or lifecycle assignments, approve TDP targets, or establish executed verification. Cross-cutting consequences belong in linked scenarios and narratives, rather than duplicate concept pages.
Scalability and elasticity
The proposed Scalability meaning compares acceptable capacity across resource configurations. Proposed Elasticity asks whether provisioning and release follow rising and falling demand adequately and promptly. Capacity retains its approved meaning: workload limits under declared constraints at a configuration.
| Reading question | Worked example | Limit |
|---|---|---|
| How does acceptable capacity change with resources? | Steady configuration comparison: highest tested passes rise from 40 to 70 requests/s when instances double. | Intermediate rates are untested; a factor of 1.75 is not an exact capacity ratio or linear law. |
| Does capacity follow demand in time, including release? | G05: late adjustment misses startup timing and readiness despite reaching four instances. | A policy or final size alone proves no acceptable transition or total-cost saving. |
Both examples are synthetic and their criteria unapproved. The guide distinguishes horizontal, vertical and automatic scaling tactics from these quality outcomes. Existing G01 observations and approved concept definitions remain unchanged. Lifecycle assessments and the proposed Flexibility mapping supply no semantic parentage.