Functional suitability evaluation
A complete function inventory, correct results and an achievable task answer different questions. Functional suitability requires their context to be explicit. This guide audits no actual TDP requirements.
Document content and editorial review: approved on 2026-11-16 by Codex under the repository user’s delegated review. Approval covers this explanation and its stated evidence limits; semantic, mapping, lifecycle, applicability and target states remain independent.
Conceptual overview
%%{init: {'theme':'base','fontFamily':'Arial, sans-serif','themeVariables':{'lineColor':'#8792a2','textColor':'#f8fafc','nodeTextColor':'#f8fafc','primaryTextColor':'#f8fafc','arrowheadColor':'#8792a2','dropShadow':'none','useGradient':false,'edgeLabelBackground':'#252b36','fontSize':'16px'}}}%%
flowchart TD
accTitle: G11 three independent questions
accDescr: Declared user needs frame completeness, correctness and appropriateness checks. Each needs scoped evidence before a suitability decision; edges describe evaluation, not ISO hierarchy.
N["Needs and context"]:::context -->|check coverage with| C["Completeness"]:::quality
N -->|check results with| R["Correctness"]:::quality
N -->|check task achievement with| A["Appropriateness"]:::quality
C -->|inform| D["Scoped suitability decision"]:::context
R -->|inform| D
A -->|inform| D
classDef context fill:#343c4b,color:#f8fafc,stroke:#8792a2,stroke-width:2px
classDef quality fill:#24452a,color:#f8fafc,stroke:#8792a2,stroke-width:2pxText equivalent: declared needs frame completeness, correctness and appropriateness. All inform the suitability decision without substituting for one another. Provenance: synthetic G11 author exercise; the evaluation arrows establish no framework parentage.
G11 scenario
All observations and criteria are synthetic and unapproved. A fictional clerk must submit an approved expense claim in one supported workflow; this implies no TDP feature or user requirement. Freeze artifact F1, role permissions, locale, fixture and task instructions for all alternatives.
| QAS field | Declared condition |
|---|---|
| Stimulus source | Authorized clerk in the exercise. |
| Stimulus | Submit two eligible expenses and obtain the approved claim record. |
| Artifact | Synthetic claim workflow F1 and a separately authored six-obligation checklist/result oracle. |
| Environment | Isolated test context, one authorized role, amounts in exact whole units, no external spreadsheet or facilitator rescue. |
| Response | Supply all required functions, compute exact results and allow completion through supported steps. |
| Response measure | 6/6 obligations supported, every named oracle check correct, task completed without unsupported workaround in at most 5 elapsed minutes. |
| Obligation | Independent expected result and trace |
|---|---|
| O1 Capture expenses | Entries retain identifiers E1/E2 and exact amounts 80/40 units. |
| O2 Validate eligibility | Eligible entries accepted; the separate negative fixture with a missing receipt is rejected without creating a claim. |
| O3 Calculate total | Independent arithmetic oracle: 80 + 40 = 120 units. |
| O4 Request approval | One pending request references both entries and the 120-unit total. |
| O5 Record approval | Authorized approver can approve; unauthorized actor is denied without state change. |
| O6 Obtain final record | Clerk can retrieve the approved 120-unit record with both entries and approval identity. |
The requirement owner in a real study must validate this inventory independently of the implementation. Trace each obligation to the supported action, expected result and observed outcome; record missing functions rather than removing them from the denominator. The oracle is a separately reviewed rule sheet, not the program’s own calculation. Record all listed positive/negative checks, elapsed time from first entry to final retrieval, interventions and incomplete attempts.
G11 results and decisions
| Synthetic case | Outcome | Decision |
|---|---|---|
| A | 6/6 obligations; all named oracle checks pass; complete supported task in 4 minutes | Passes the stated example only. |
| B | O6 absent; all implemented calculations correct; 5/6 obligations supported | Fails completeness and suitability; correct existing calculations do not restore the missing obligation. |
| C | 6/6 functions present and individual results correct; task needs an unsupported spreadsheet to carry entry identifiers to approval | Fails appropriateness, regardless of a 3-minute assisted completion. |
| D | 6/6 functions and an achievable task, but total is 119 instead of 120 | Fails correctness; function presence is insufficient. |
Example: the denominator needs an owner. Five passing tests can cover all five implemented functions while O6 is missing. A 100% test or code-coverage result does not establish that the six required obligations are covered, or that the six-item inventory is itself complete for a real business need.
These cases illustrate rejection rules, not executed usability studies or product findings. Stakeholders must decide actual scope, eligibility rules, task conditions, acceptable assistance and criteria. Missing capability can force rework or manual reconciliation; additional functions add design, implementation, training and support cost. No approved priority or delivery estimate follows.
Techniques and trade-offs
Compare baseline B with a treatment adding supported O6 under the same six obligations, fixture, roles and oracle. Synthetic baseline supports 5/6 at 2 engineer-hours of setup/verification; treatment adds 2 implementation, 1 review and 1 verification hour, totaling 6 engineer-hours, and supports 6/6 in 4 minutes. These invented totals demonstrate cost accounting, not measured productivity. Task time is elapsed time; engineer-hours include every contributor. Repeat with matched tasks before attributing improvement to the treatment.
| Question / technique | Benefit and prerequisites | Cost, interaction and rejection |
|---|---|---|
| Completeness: obligation trace | Can expose missing functions if stakeholders validate the inventory independently. | Elicitation and change maintenance cost time; reject omitted obligations or a denominator drawn only from code. |
| Correctness: independent oracle | Can expose wrong values and access/state effects with declared exactness and negative cases. | Rule review and fixture upkeep cost effort; reject shared implementation mistakes even with high coverage. |
| Appropriateness: end-to-end task walkthrough | Can expose unsupported transitions with representative roles and context. | Recruitment, observation and training cost effort; reject rescue or hidden spreadsheet work. |
| Suitability: joint evaluation | Can prevent a favorable measure hiding another failed condition. | Additional evidence and cross-role coordination remain necessary; reject any required criterion failure. |
More functions can complicate usability or increase security surface. Keep authorization checks enabled and account for ongoing support and regression work separately. The technique is the intervention; a quality label itself changes no behavior.
Aliases and source limits
C131, Correctness, is a scoped alias candidate for Functional correctness, not a universal equivalence. A faithfully stored source value can still be incorrect for a calculation rule. Conversely, correct summation of inaccurate input cannot establish data-quality accuracy. Statistical ML accuracy needs its own labeled prediction population; 90 correct labels out of 100 predictions would describe that synthetic population, not the correctness of this expense workflow. No data-quality or ML concept is added by this distinction.
The ISO/IEC 25010:2023 catalogue, consulted 2026-11-16, confirms published edition 2 and a nine-characteristic model, not these detailed definitions. The original secondary label intake remains unverified against full text; edition-qualified mappings stay proposals. Q42 supplies its own overlapping suitable tag, not ISO equivalence. These local proposals do not replace Tdp.Backend’s functional authority or audit its requirements.
Audience paths
Read the executive decisions and technical evaluation.