Portability
The ability to transfer required capability between specified platforms or environments with acceptable adaptation and resulting operation. This scoped local reading remains a proposal for semantic owner review.
Document content and editorial review: approved on 2026-11-16 by Codex under the repository user’s delegated review. Approval covers this explanation and its stated evidence limits; semantic, mapping, lifecycle, applicability and target states remain independent.
Applicability and worked use
Which source and destination contexts, adaptation effort and retained behavior define an acceptable transfer?
Example: Portability in context. G10 requires the same behavior on two platforms in two environments. Passing three of the four combinations leaves one declared transfer unsupported. The example is synthetic; its outcomes and limits are illustrative and unapproved.
Nearby concepts and tactics
Adaptability evaluates accommodating a declared difference; cross-platform execution and cross-environment execution check resulting behavior. Historical Portability and current Flexibility are not automatically equivalent.
Use the technique evaluation for prerequisites, controlled comparisons, costs and rejection criteria.
Sources and limits
The source and alias limits distinguish local wording, source labels and edition-qualified mappings. The ISO catalogue establishes publication metadata, not this definition or taxonomy. Q42 is primary for its own organization and secondary for ISO attributions. No equivalence is confirmed.
Applicability to TDP, ownership, lifecycle, mappings and targets remain pending. No Tdp.Backend code or runtime was inspected.
Scenario and audience
Follow the G10 scenario, worked results and decisions, executive decisions and technical discussion.
Lifecycle assessment
assessed; proposal. Assignment: runtime, development-time.
Transfer requires adaptation and verification work before deployment, together with correct capability in the destination operating context. Sources: local.