Availability and reliability guidance
Document content and editorial review: approved on 2026-11-17 by Codex under the repository user’s delegated review. Approval covers this explanation and its stated evidence limits; semantic, mapping, lifecycle and target states remain independent.
This guide evaluates a hypothetical project-information service during faults and recovery. The family comparison links the approved local qualities; G02 supplies synthetic examples, not observations of TDP. Local meanings are approved; mappings, lifecycle assessments and targets remain proposals.
Conceptual overview
%%{init: {'theme':'base','fontFamily':'Arial, sans-serif','themeVariables':{'lineColor':'#8792a2','textColor':'#f8fafc','nodeTextColor':'#f8fafc','primaryTextColor':'#f8fafc','arrowheadColor':'#8792a2','dropShadow':'none','useGradient':false,'edgeLabelBackground':'#252b36','fontFamily':'Arial, sans-serif','fontSize':'16px'}}}%%
flowchart TD
accTitle: Evaluate failure, continuity and restoration separately
accDescr: Normal service establishes a baseline. An injected fault tests continuity, restoration and data reconciliation; abnormal inputs have a separate robustness check. All results must meet scoped criteria together.
N["Normal workload and baseline"]:::context -->|inject one defined fault| F["Continuity during the fault"]:::quality
F -->|measure interruption and restoration| R["Restored service and data"]:::quality
I["Abnormal-input variant"]:::context -->|check controlled handling| B["Robustness"]:::quality
R -->|evaluate together| M["Time, correct outcomes and data checks"]:::measure
B -->|evaluate together| M
classDef context fill:#343c4b,color:#f8fafc,stroke:#8792a2,stroke-width:2px
classDef quality fill:#24452a,color:#f8fafc,stroke:#8792a2,stroke-width:2px
classDef measure fill:#503824,color:#f8fafc,stroke:#8792a2,stroke-width:2pxText equivalent: G02 fixes normal conditions, injects a single fault, and checks fault tolerance and recoverability separately. The abnormal-input variant checks robustness. All relevant criteria must hold. Arrows describe an evaluation process, not observed architecture or membership.
Provenance: local synthetic scenario using the pilot’s six-component method. No fault injection or product investigation was executed.
Sources and scope
Consultation on 2026-11-09: the ISO catalogue identifies published ISO/IEC 25010:2023, edition 2, November 2023. Catalogue access does not verify definitions, amendments or complete subcharacteristic coverage. The Q42 model uses overlapping tags, not a tree. Individual Q42 publisher pages inform the related proposals in each concept’s metadata; their quotations attributed to ISO are secondary evidence of ISO wording, not full-standard consultation.
Use Faultlessness for the local normal-operation quality. Its approved local definition is not a claim of ISO conformance. The SEI method is historical methodological evidence re-read for this slice, not a newly verified taxonomy. See the delivery source record.
Measures and boundaries
Availability needs a service, eligible users, required-use schedule and explicit up-state predicate. Here a read must return the expected authorized version within 2 s; the service is up only while a continuous test oracle establishes that predicate for the offered workload. This idealized oracle supplies exact interval boundaries in the synthetic example. Real probes sample, so report resolution, gaps and uncertainty rather than treating each success as proof of the whole intervening interval.
| Measure | Local measurement contract | Interpretation limit |
|---|---|---|
| Uptime | Total seconds satisfying the up-state predicate in the required-use window | A process running or a health endpoint returning 200 is insufficient |
| Downtime | Union of seconds failing that predicate in the same window | Count overlapping incidents once; include detection and recovery delays |
| Time availability | Uptime / (uptime + downtime), with all required-use time classified | Unknown time stays unknown; do not silently remove it from the denominator |
| MTBF | Total up-time exposure / counted service-failure events, for the stated repairable-service observation protocol | A sample estimate, not a promised failure-free interval or a software wear model |
Example: one denominator, two different questions. In synthetic G02 A, 3,580 s up plus 20 s down equals the full 3,600 s required-use window: 3,580 / 3,600 = 99.444…% time availability. At 10 reads/s, the same outage loses 200 of 36,000 offered reads. Those ratios happen to agree because this example uses a constant rate and a binary oracle. Real request success and time availability need not agree. Planned maintenance is not excluded here.
Reliability concerns correct service over a stated interval and conditions, not just time in an up state. A recovered service can have high availability while still having interrupted that interval. Record failure events and their definition separately from defective individual requests. For an illustrative repaired-service sample with 35,800 s of uptime, 200 s of downtime and two service failures in 36,000 s of observation, estimated MTBF is 35,800 / 2 = 17,900 s, approximately 4.97 h. Mean down duration is 200 / 2 = 100 s under this protocol. The ratio 17,900 / (17,900 + 100) equals 99.444…% for this complete sample; using that relationship to predict long-run availability requires additional modeling assumptions. No failure distribution or reliability probability is inferred. Zero observed failures gives no finite MTBF estimate and proves neither infinity nor defect absence.
G02 scenario
All following values and observations are illustrative, synthetic and unapproved. The hypothetical read/write service is not an observed TDP endpoint. It serves synthetic project information to authorized users; no functional contract or deployment is inferred from its name. Use the existing scenario template.
| Component | G02 contract |
|---|---|
| Stimulus source | A test controller acting on one service instance in an isolated test environment |
| Stimulus | Stop that instance at t=1,200 s and keep it stopped for the remainder of a 3,600 s run |
| Artifact | Hypothetical project-information service, its routing, state store and recovery procedure as one declared evaluation boundary |
| Environment | Fixed 100,000-record synthetic dataset; 10 valid authorized reads/s and one versioned update every 60 s; continuous monitoring; no maintenance exclusion; identical resources/configuration except the candidate intervention |
| Response | Continue correct authorized reads where possible, detect interruption, restore the declared service state, and reconcile every acknowledged update without duplicate effects |
| Response measure | At least 99% time availability; no more than 30 s from fault injection to restored up state; zero lost acknowledged updates, duplicate update effects or unauthorized results; each valid read completed within 2 s counts as successful |
The controller schedules 60 updates with distinct idempotency keys at t=30, 90, …, 3,570 s. In Run B, the update scheduled for t=1,230 s falls inside the outage. The controller holds it and submits it after restoration, before the next scheduled update. All other updates are submitted on schedule; all 60 receive one acknowledgment outside the down intervals. This is a synthetic test-controller rule, not a service queue or retry guarantee. Reads use a precomputed version oracle: a read dispatched after an update acknowledgment must return that version or newer. This is an example freshness rule, not the definition of the unresolved label Consistent. Malformed traffic is excluded from this valid-demand population and evaluated separately below.
G02 worked results
These are two independent synthetic runs, not measured trials or evidence of statistical confidence. Affected reads fail immediately; no in-flight work crosses the evaluation window. Other reads satisfy the 2 s rule. No downtime occurs outside the stated interruption.
| Observation | Run A | Run B |
|---|---|---|
| Down interval | [1,200, 1,220) s | [1,200, 1,280) s |
| Uptime / downtime | 3,580 s / 20 s | 3,520 s / 80 s |
| Correct reads / failed reads / offered reads | 35,800 / 200 / 36,000 | 35,200 / 800 / 36,000 |
| Time availability | 99.444…% | 97.777…% |
| Fault-to-restoration | 20 s | 80 s |
| Acknowledged / preserved distinct updates | 60 / 60 | 60 / 60 |
| Lost acknowledged updates / duplicate effects / unauthorized results | 0 / 0 / 0 | 0 / 0 / 0 |
| Joint illustrative result | Pass | Fail availability and recovery time |
Example: recovery does not erase failure. Run A passes G02’s illustrative availability, restoration and data criteria, but has a 20 s interruption. It therefore does not satisfy a stricter fault-tolerance requirement of uninterrupted reads during the same fault. Run B preserves all acknowledged updates but misses both time criteria: 3,520 / 3,600 = 97.777…% and 80 > 30 s. Neither aggregate uptime nor a running replacement proves restored data.
For a strict continuity variant, retain the same fault and require zero failed valid reads during it. Synthetic variant C serves 36,000 of 36,000 correct reads, with 3,600 s uptime and zero unauthorized results, while one instance stays down. It passes that scoped continuity check but does not establish tolerance of state-store failure, correlated faults or arbitrary failures. Its redundancy mechanism and restoration of full redundancy require separate evaluation.
For Faultlessness, a separate no-injection control with the same normal workload has 36,000 correct reads, 60 preserved updates and zero observed service failures. That supports only this normal-run example; it proves no absence of latent faults. It supplies no confirmed ISO meaning.
G02-R abnormal-input variant
Send 100 oversized or structurally invalid requests at fixed recorded times alongside the same valid-demand run. The illustrative criteria are controlled rejection of all 100, zero partial writes, no sensitive error disclosure, and unchanged valid-read/data criteria. A synthetic passing outcome rejects 100/100 and leaves the 36,000 valid reads and 60 updates correct in a no-fault run. A counterexample rejects 99/100 but crashes on the remaining request, losing 10 s of valid service (100 valid reads): it fails robustness even if its 99.722…% time availability meets the less stringent G02 time criterion. Controlled invalid-request rejection is expected behavior, not valid-service failure. These observations demonstrate reasoning only; no attack testing or AI/model robustness assessment was performed.
Technique evaluation and verification
A scenario tests expectations; a controlled intervention comparison tests a technique. Neither a quality label nor an observed recovery proves causation. Record baseline and candidate configuration, resource allocation, dependency versions, read/update trace and oracle before comparing. Replay the same seeded workload and fault time with clean state, alternate order and repeat runs. Record per-trial variation; one synthetic row cannot quantify uncertainty.
| Proposed technique and benefit | Applicability and prerequisites | Limits, costs and interactions | Verification and rejection |
|---|---|---|---|
| Standby routing / failover may shorten interruption for availability | A replaceable instance, trustworthy health signals, routing control and spare capacity | Duplicate capacity costs money; detection adds delay; shared storage or correlated faults can defeat it; stale replicas threaten correctness | Compare restart-only baseline B with candidate A under equal declared capacity and routing except failover. Report detection, switch and data checks; reject time or authorization failures |
| Isolation and redundancy may preserve fault-tolerant continuity | Independent failure domains, sufficient residual capacity and scoped fault model | Adds coordination, resource and testing cost; split brain and common dependencies can defeat independence; latency may rise | Apply the stricter variant C; kill the declared instance and verify every valid read, fencing and capacity; reject any failed/incorrect read under its zero-failure criterion |
| Versioned backup plus tested restore/replay may improve recoverability | Durable acknowledgments, retained backups/logs, key access, a reconciliation oracle and rehearsed procedure | Backup age and replay delay trade data loss against recovery time; restore drills consume staff/time/storage; backup existence is insufficient | Restore into isolated state; reconcile all 60 acknowledged keys and effects, then time end-to-end readiness; reject loss, duplicates, unsafe access or late restoration |
| Bounded validation and resource isolation may improve robustness | Defined size/schema boundaries, safe errors and valid-traffic accounting | Validation and limits require maintenance; over-strict limits reject legitimate work; limits need security review | Replay G02-R, check 100 rejections and no partial writes/disclosure, verify valid service concurrently; reject crashes or corrupted state |
| Defect prevention and regression checks may support normal-operation faultlessness and reliability | Representative normal traces, failure definitions, trusted results and versioned releases | Coverage is incomplete; testing costs delivery effort; software does not wear out like hardware; zero observed failures is not defect absence | Repeat the no-injection control and longer fault-specific trials; record exposure and events, not a blanket reliability guarantee |
The A/B data above illustrates how a failover candidate might change the outcome, but is not an executed causal comparison. Account separately for spare instance time, monitoring, restore drills and operator effort. A technique can improve availability yet worsen latency, costs or data integrity. Check Performance under the remaining capacity; never omit authorization or accept stale state merely to improve uptime.
Aliases and unresolved meanings
| Intake labels | Scoped disposition |
|---|---|
| Available (C204) | Related proposal to qa:availability; adjective alone supplies no required-use window |
| Fault-tolerant / fault-tolerance (C206/C147) | Related proposals to qa:fault-tolerance for the declared fault model, not universal tolerance |
| Recoverable (C207) | Related proposal to qa:recoverability; identify state, data and time criteria |
| Robust / robustness (C093/C172) | One approved local robustness identity for abnormal-condition handling, not reliability synonymy |
| Dependable / dependability (C094/C138) | Reading aggregate relating reliability to trust concerns including security and safety; no new leaf, no complete aggregate score |
| Consistent (C095) | No independent concept: repeatable behavior, data freshness and security policy consistency have different meanings; owner definition pending |
Security’s concern for availability refers to the same availability concept, without a second identity or inferred ISO parent. Security, safety, maintainability and broader resilience remain separate concerns; the aggregate framing does not implement them. These are directional related mappings, not an adopted synonym set.
Prioritization and open decisions
Apply the existing business-value/risk rubric to a real journey before proposing work. For a hypothetical time-sensitive read, interruption blocks decisions and loss of acknowledged changes risks rework; both may justify investigation. Score value, failure impact and uncertainty with the owner, not an invented priority. Choose required-use schedule, eligible users, tolerated faults, freshness/data-loss policy, response criteria, budget, on-call responsibilities and recovery authority. All remain pending for TDP.
Checklist: identify the service boundary and oracle; distinguish valid demand from invalid input; account for unknown intervals; record exposure and events; check correct restored data and access; compare techniques under controlled conditions; retain costs and uncertainty; approve real targets separately.
Source currency
Source facts and access limits are recorded at 2026-11-09, not inferred from the build date. Q42’s individual pages were consulted for Availability, Reliability, Fault tolerance, Recoverability, Robustness, Faultlessness and Dependability. Each approved local concept retains its specific URL. Broader ISO measurement and edition status was rechecked: 25010:2011 is withdrawn; 25023:2016 remains published with planned replacement; DIS 25000-23.2 is still a draft, now at stage 40.60 (close of voting 2026-11-06), superseding the historical stage-40.20 observation. No amendment or full-text completeness is inferred from catalogue access. The SEI section-2.1 scenario method was re-read; it supplies no current quality taxonomy. Tdp.Backend remains functional authority; neither it nor experimental tdp-project was investigated for G02.