Skip to content
English

Integrability

Document content and editorial review: approved on 2026-11-16 by Codex under the repository user’s delegated review. Approval covers this explanation and its stated evidence limits; semantic, mapping, lifecycle and target states remain independent.

The ability to bring specified components or systems together for a stated purpose within defined integration effort and constraints. This local definition is a proposal for owner review. Applicability, mapping, lifecycle and targets remain unapproved. Editorial approval of this explanation is separate from semantic acceptance.

Conceptual overview

%%{init: {'theme':'base','fontFamily':'Arial, sans-serif','themeVariables':{'lineColor':'#8792a2','textColor':'#f8fafc','nodeTextColor':'#f8fafc','primaryTextColor':'#f8fafc','arrowheadColor':'#8792a2','dropShadow':'none','useGradient':false,'edgeLabelBackground':'#252b36','fontFamily':'Arial, sans-serif','fontSize':'16px'}}}%%
flowchart LR
  accTitle: Integration effort and outcome
  accDescr: Specified components and constraints define integration work; measure that effort and verify the integrated outcome separately. This is a proposed evaluation relationship.
  A["Specified components and constraints"]:::context -->|require| B["Integration work and effort"]:::measure
  B -->|followed by| C["Correct integrated outcome"]:::quality
  classDef context fill:#343c4b,color:#f8fafc,stroke:#8792a2,stroke-width:2px
  classDef measure fill:#503824,color:#f8fafc,stroke:#8792a2,stroke-width:2px
  classDef quality fill:#24452a,color:#f8fafc,stroke:#8792a2,stroke-width:2px

Text equivalent: Specified components and constraints define the integration work and effort; the evaluation also checks the correct integrated outcome. Arrows describe the local evaluation, not domain membership. The overview is an editorial synthesis of the proposed definition and the hypothetical example below; it is not a verified TDP architecture.

Applicability and worked use

What components must be integrated, by whom, under what constraints, and how will integration effort and correctness be assessed?

Example: outcome and limits. A hypothetical team has an illustrative limit of four person-days to connect two systems and pass agreed exchange tests. A three-person-day integration that passes those tests meets both conditions. A six-person-day integration that passes the same tests achieves the exchange but fails the effort limit; a two-day integration with incorrect units fails correctness. The limits and results are synthetic, not TDP targets.

Nearby concepts and tactics

Interoperability asks whether information is exchanged and used correctly; that result does not reveal integration effort. Compatibility concerns operation under stated conditions, while coexistence concerns interference in a shared environment.

An API contract can record agreed operations, data and constraints; an API standard can provide shared protocol rules; an exchange format can specify a representation. These are tactics or controls, not separate quality attributes. Their usefulness and cost depend on the scenario. RFC 8259 describes JSON’s representation; valid JSON alone does not establish agreement on units or meaning.

Sources and limits

The SEI publisher abstract identifies integrability as an architectural quality and discusses scenarios and mechanisms; it does not establish this local wording or lifecycle assignment. RFC 8259 supplies format context, not a TDP contract. The ISO 2023 catalogue was a source lead; its full definitions were not consulted, so no exact ISO equivalence or hierarchy is claimed. Historical ISO 2011 meanings and their mapping to the 2023 edition remain unverified in this consultation. No Tdp.Backend source or runtime was examined. The independent lifecycle metadata above is a local assessment for review, not an accepted framework classification.

Scenario and audience

The synthetic G06 scenario and its results show the measurement boundaries and failure decision. The controlled tactic evaluation explains evidence and costs. The executive discussion frames ownership and consequences; the technical discussion frames verification and rejection.

Lifecycle assessment

assessed; proposal. Assignment: development-time.

The question concerns work to establish or change an integration; its outcome must be tested in operation, but successful operation alone does not measure the work. Sources: local.