Compatibility and integration guidance
Document content and editorial review: approved on 2026-11-16 by Codex under the repository user’s delegated review. Approval covers this explanation and its stated evidence limits; semantic, mapping, lifecycle and target states remain independent.
Semantic mappings, lifecycle assessments and targets remain proposals. This guide uses synthetic observations; it makes no claim about TDP behavior.
Conceptual overview
%%{init: {'theme':'base','fontFamily':'Arial, sans-serif','themeVariables':{'lineColor':'#8792a2','textColor':'#f8fafc','nodeTextColor':'#f8fafc','primaryTextColor':'#f8fafc','arrowheadColor':'#8792a2','dropShadow':'none','useGradient':false,'edgeLabelBackground':'#252b36','fontFamily':'Arial, sans-serif','fontSize':'16px'}}}%%
flowchart LR
accTitle: Evaluate an integration under stated conditions
accDescr: A sender exchanges information with a receiver, whose correct use is checked. Shared resources are checked for interference and integration effort is measured separately.
S["Sender"]:::context -->|exchange| R["Receiver"]:::context
R -->|check meaning| U["Correct use"]:::quality
S -->|shares resources| C["Interference check"]:::measure
R -->|shares resources| C
E["Integration effort"]:::measure -->|measured separately| U
classDef context fill:#343c4b,color:#f8fafc,stroke:#8792a2,stroke-width:2px
classDef quality fill:#24452a,color:#f8fafc,stroke:#8792a2,stroke-width:2px
classDef measure fill:#503824,color:#f8fafc,stroke:#8792a2,stroke-width:2pxText equivalent: G06 checks exchange and correct use, shared-resource interference and integration effort separately under stated conditions. Compatibility asks whether the specified combination works in those conditions. Arrows describe checks, not membership. Provenance: local synthetic example, not observed architecture.
G06 scenario
The following six components specify an illustrative, unapproved test:
| Component | Synthetic conditions |
|---|---|
| Stimulus source | A partner’s sender and an independent neighboring workload |
| Stimulus | Send 100 unique order quantities while the neighbor uses a shared queue |
| Environment | Isolated test environment, one-hour window; fixed sender and receiver versions, queue quota and configuration |
| Artifact | Sender, queue, receiver and receiver’s order store; no TDP deployment is represented |
| Response | Receiver parses each message, records its identifier and quantity in kilograms; neighbor completes its own requests |
| Response measure | Correct unique orders / 100, neighbor successes / 100, and engineer-hours to integrate and verify; illustrative criteria 100/100, at least 99/100, zero duplicate writes, and at most 8 engineer-hours |
The population is 100 distinct orders of 10 kg each and 100 neighbor requests; the order denominator is the fixed 100 expected unique identifiers, not the number of attempts. Record attempts, retries, failures, missing and late orders, and duplicate writes separately. A duplicate write fails correctness even if every unique identifier is present. Only records completed within the window count. A test oracle compares identifiers, quantity and unit against the agreed source records and checks for duplicate writes. The one-hour observation window is separate from the integration-effort exercise. Sum engineer-hours for setup, investigation, adaptation, verification and retesting; multiple people can contribute to that total. Exclude procurement and later operations from that total and evaluate them as additional costs. Repeat with equivalent data, versions and quota; this single synthetic window does not establish production reliability or generalize to other partners.
G06 results and decisions
Synthetic pass: 100 orders arrive once and are recorded as 10 kg, 99 neighbor requests succeed, and integration takes 7 engineer-hours. There are zero duplicate writes, and all illustrative criteria pass. Synthetic failure: 100 valid JSON messages arrive, but 10 are recorded as 10 pounds; only 90/100 are correct. The neighbor completes 95/100 and integration takes 9 engineer-hours. Correct use, coexistence and effort criteria fail; transport success cannot rescue the overall decision. Reject this combination until the unit mismatch and shared-resource failures are investigated and corrected and the same checks pass. Neither result is observed evidence or an approved target.
For the coexistence comparison, an isolated neighbor baseline completes 100/100 requests under the same quota, data and configuration. The shared pass completes 99/100 and the shared failure 95/100. These synthetic contrasts explain the threshold decision; repeated controlled runs are needed before attributing an observed change to resource sharing. A single success count cannot establish absence of interference or production behavior.
Example: a valid representation can carry the wrong meaning. JSON syntax can be valid while both parties interpret a number in different units. Compare the stored unit and quantity with the source, not only parsing or HTTP status.
Controlled tactic evaluation
Use the same versions, workload, oracle, queue quota and personnel experience for each baseline and treatment. Randomize order or repeat with fresh equivalent fixtures to reduce learning effects. Record failures, setup and maintenance cost as well as the decision; no tactic guarantees success.
API contracts
Prerequisites are accessible provider/consumer interfaces, agreed business units, a version owner and representative fixtures. Explicit errors and duplicate rules can protect integrity and reduce ambiguous changes, but maintaining consumer checks costs change effort. Runtime validation can add time and resource use; check these effects within the declared service constraints.
Baseline: an informal field list, with the failing G06 results above. Treatment: a versioned agreement specifying identifiers, units, errors and duplicate handling, with consumer and provider checks. Synthetic treatment: 100/100 correct, 99/100 neighbor successes, 5 integration engineer-hours plus 2 engineer-hours to author and verify the agreement, for 7 engineer-hours total. Ongoing maintenance is a separate operating cost, outside this initial-effort comparison. Accept for this illustration only if that cost is justified by reduced mismatch; reject when either correctness or the neighbor criterion fails, or total cost exceeds the owner’s budget. The agreement must be tested against both implementations and version changes. Cost the baseline using the same setup, investigation and verification boundary before claiming an effort saving; the seven-hour treatment total alone establishes no saving. Test version mismatch, malformed input, duplicate delivery and unit disagreement separately.
API standards
Adoption requires a selected protocol/version supported by both parties, a conformance method, migration plan and ownership of upgrades. Shared rules can reduce bespoke negotiation and tooling work. A protocol upgrade may interrupt availability, require renewed compatibility checks and change security assumptions. Budget setup, coordinated rollout and ongoing conformance/upgrade work; conformance alone establishes neither secure exchange nor acceptable service.
Baseline: the same informal exchange; treatment: a shared, versioned protocol standard with identical business data and tests. Measure interoperability and integration effort, including migration, tooling and conformance checks. A synthetic 100/100 parsed but 90/100 correctly used is a rejection: protocol conformance did not fix units. A standard can reduce negotiation while adding upgrade and compatibility costs; select only if all G06 criteria and the owner’s cost limit hold.
Data exchange formats
Prerequisites are compatible parsers, explicit encoding, field/unit agreements and an oracle that checks round-trip meaning. A shared JSON representation may reduce custom parser and adapter work when those agreements hold. Its payload size and parsing costs can affect performance efficiency; conversion errors can damage integrity. Validate untrusted input and parser limits under the chosen security controls. Include migration/setup cost and ongoing parser/contract maintenance before claiming that less custom work offsets those costs.
Baseline: an agreed ad hoc encoding; treatment: JSON under RFC 8259 with the same values, unit agreement, workload and oracle. Count correct records and engineer-hours including conversion and parser maintenance. A synthetic 100/100 parse and 90/100 correct use fails. Reject a format migration that loses meaning, breaks the neighbor threshold or exceeds the cost limit even if parsing improves. The baseline and treatment are illustrative comparisons, not measured trials.
Sources and scope
The SEI publisher abstract identifies report CMU/SEI-2020-TR-001 (2020) and a scenario-based analysis; the full report was not consulted. RFC 8259 (2017) defines JSON’s representation, not this application’s units or agreement. The arc42 Integrability reading distinguishes effort from runtime exchange in its own organization; its external quotations do not verify ISO wording. The ISO catalogue identifies ISO/IEC 25010:2023 edition 2; full definitions were not consulted. Exact mappings and hierarchy remain proposals for owner review. No Tdp.Backend revision or runtime was examined, and no integration commitment follows.